• Photo 134996491 © Diego Vito Cervo | Dreamstime.com
    Pacific Northwest National Laboratory
    Photo 29759450 © Eldadcarin | Dreamstime.com
    Photo 138879981 © Tascha Rassadornyindee | Dreamstime.com
    Contractingbusiness Com Sites Contractingbusiness com Files St Louis Med Center

    Wiegmann Associates Begins Renovation Project at St. Louis VA Medical Center

    Nov. 11, 2019
    The firm will remove 50-year-old HVAC systems from Buildings 1, 51 and 52 and install new, more energy-efficient equipment as well as new ductwork, piping and insulation.

    ST LOUIS, MO – Wiegmann Associates has begun work on the $8 million renovations at the St. Louis VA Medical Center-Jefferson Barracks to replace outdated heating and cooling systems. Wiegmann Associates is the mechanical contractor and Trine/Poettker joint venture is the general contractor.

    The Plan & Spec project involves removing the 50-year-old HVAC systems from Buildings 1, 51 and 52 and installing new, more energy-efficient equipment as well as new ductwork, piping and insulation.

    Building 1 houses the VA’s patient services, administrative offices and various medical clinics. Building 51 is used for mental health services and Building 52 features a chiropractic clinic as well as the spinal cord injury care and pain rehabilitation center.

    Wiegmann also is installing the HVAC system to serve a new rehabilitation facility, which is currently under construction and scheduled to complete in the Spring of 2020.

    Wiegmann previously installed the heating and cooling systems in the 67,000-square-foot Jefferson Barracks VA Engineering Warehouse. Poettker Construction was the general contractor for that project, which completed in 2018.